BIM guidelines around the world
This article needs more work. To help develop this article, click 'Edit this article' above.
Almost all BIM guidelines in the world have 4 major parts:
- Project Execution Plan (PEP)
- Modelling Methodology (MM)
- Levels of Detail (LODs)
- BIM protocol and information organisation (P&O)
Until 2015 in the USA, some departments of state published 47 BIM guidelines and standards to implement BIM efficiently, in which 17 were published by government office and 30 were published by non-profit organizations:
- General Services Administration (GSA) plans to publish 8 BIM guidelines. They published 6 instructions from 2007 to 2011 and 2 others are yet to be publish.
- National Institute of Building Sciences (NIBS) published 2 BIM standards and are preparing to publish a 3rd.
- The American Institute of Architects, Association of General Contractors (AGC), universities, state and city also publish other BIM guidelines and standards. The Pennsylvania state university and Association of contractors have all 4 of the above parts. Some others don’t have 4 parts, of which about 50% don’t clarify Level of detail (LODs).
In the present, Europe have about 34 BIM instructions and standards, in which:
- 18 were published in the United Kingdom by the Construction Industry Council (CIC), BIM Task Group, British Standards Institution (BSI), AEC-UK…,
- 6 were publish in Norway by Statsbygg – a government department and the Norway Association of construction.
- There are others in Finland, Denmark, and Sweden. Especially in Finland, where there are BIM application instructions for not only civils work but also for infrastructure and bridge projects.
Almost all of the publishers in Europe lack 2 parts: PEP and LODs. Only BIM the specification of AEC-UK have full of 4 parts.
In Asia, there are 35 BIM protocols, in which:
- 12 were published by Singapore Building Construction Authority (BCA) and other government departments.
- Others were published in Korea, Japan, China, Taiwan and Hong Kong.
As with Europe, almost all of them lack 2 parts: PEP and LODs. Only its version 2 of BCS have full 4 parts.
source: www.vibim.com.vn
[edit] Related articles on Designing Buildings Wiki
- BIM and facilities management.
- BIM articles.
- BIM execution plan.
- BIM glossary of terms.
- BIM resources.
- Building information modelling.
- Construction Operations Building Information Exchange (COBie).
- CIC BIM Protocol.
- Global BIM market.
- Industry Foundation Classes.
- Level of detail.
- Level of Development LOD.
- PAS 1192-2:2013.
- PAS 1192-3:2014.
- Uniclass.
Featured articles and news
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.